osmo-bts/tests/meas
Pau Espin c80abd109b MS Power Control Loop: Feed UL C/I from correct measurement period
As per 3GPP TS 45.008 sec 4.2, the ms_pwr received in L1 SACCH Header is
the value used over previous measurement period. Hence, we need to feed
the algo with the measurements taken over that same period.

Related: SYS#4917
Change-Id: I13c0014fdd73f823ae5b1256c35bfa7d97cfa334
2021-09-13 17:52:24 +02:00
..
Makefile.am meas_tests: Avoid redefining all bts_model stubs 2020-06-18 14:19:43 +02:00
meas_test.c [VAMOS] Merge bts_trx_init() into gsm_bts_trx_alloc() 2021-05-11 03:54:07 +02:00
meas_test.ok measurment: write irssi_full_sum variable correctly 2020-01-20 14:33:51 +00:00
meas_testcases.h MS Power Control Loop: Feed UL C/I from correct measurement period 2021-09-13 17:52:24 +02:00
sysmobts_fr_samples.h measurement: fix measurment report 2017-07-10 15:30:59 +00:00