Pau Espin
f8d0389c70
Lots of times, the MS power class is unknown until after the first channel has been activated, at which point the MS power class is received in messages such as LU update or CM Service Requet. Since the MS Power level is sent upon CHAN ACT, the only way to communicate the change of maximum MS Power (based on MS power class) after CHAN ACT is to send a MS Power Control msg. Let's do that. Related: OS#4244 Change-Id: I3d6b75578e5cb9b2ad474a0ad01362d846ebe135 |
||
---|---|---|
.. | ||
Makefile.am | ||
nanobts_omlattr_test.c | ||
nanobts_omlattr_test.ok |