These reflect the plan for refactoring, and will be implemented by
I82e3f918295daa83274a4cf803f046979f284366 and
Id7a4407d9b63be05ce63f5f2768b7d7e3d5c86fb
Change-Id: I29e31b753e23a4207662e0e385a337e7df836f45
Add lchan and timeslot FSM charts to illustrate planning of how osmo-bsc should
handle lchan assignment and release.
Modify assignment, handover, lchan-release charts according to the new plan.
Change-Id: I18d60de5ee932c962aad0a532965a55d570bb936
In doc/, add two message sequence charts with lots of implementation specifics,
to clarify the current code state. Mark various problems in red notes.
This chart and others should help to illustrate future code changes as I go
along refactoring handover, lchan allocation and adding inter-BSC handover.
Change-Id: I20999e938441d4fed2d37462b262b74a696f616d