Commit Graph

14 Commits

Author SHA1 Message Date
Vadim Yanitskiy 62b1e4812a bts/expected-results.xml: TC_sacch_chan_act_ho_sync should pass now
Change-Id: I872111dae761bda038d2e881ab5f4e6b7f52ec90
2020-12-08 17:10:45 +01:00
Vadim Yanitskiy d020249f17 bts/expected-results.xml: add missing SMSCB-over-SDCCH8 expectations
Change-Id: I903ede1c78e103d24a93f2e6b0e1acd136405099
2020-12-08 15:58:15 +01:00
Vadim Yanitskiy 09294d9052 bts: update some expectations in expected-results.xml
Change-Id: I32fecb538a7724b35340fbfbe6b3878ca363bf8f
2020-11-14 21:38:15 +00:00
Vadim Yanitskiy a16749582e bts/expected-results: TC_rsl_bs_pwr_static_{ass,power_control} pass now
Change I16cc50dfca102030380a06e16c234d5f6698f38f fixes them both.

Change-Id: I2e8db76be78fffcc8418096670ad3cf5174856f8
2020-06-16 01:44:21 +07:00
Neels Hofmeyr a4d2100431 update expected results
Change-Id: I37014274ee97f09985c31966e7cc9122fe11a856
2020-05-19 19:25:35 +00:00
Vadim Yanitskiy 51cbc104c6 BTS_Tests.ttcn: add TC_pcu_ext_rach_content() for 11-bit RACH
According to 3GPP TS 04.60, section 11.2.5a, the extended (11-bit)
Access Burst on RACH/PRACH is used by the MS to indicate its EGPRS
capability. One of the alternative synch. sequences (see 3GPP TS
05.02, TS1 and TS2) shall be used.

Add a test case to verify extended (11-bit) RACH decoding.

Depends: (OsmocomBB) I36fd20cd5502ce33c52f644ee4c22abb83350df8
Change-Id: I8fe156aeac9de3dc1e71a4950821d4942ba9a253
Related: OS#1854
2019-04-23 14:49:36 +00:00
Neels Hofmeyr 2caf349752 update expected results
Change-Id: Idacaf8343bed4a37878eacdf338c4d5eb46bf7a7
2019-01-23 12:44:42 +01:00
Philipp Maier 4d1e9c9254 BTS_Tests: Verify RSL MS POWER CONTROL and SACCH MS POWER LEVEL
Usually the MS power is controlled by the BTS and there is no continous
supervison by the BSC needed. However, a scheme where the BSC takes care
of the power control loop exists. The power is then set via RSL using an
RSL MS POWER CONTROL message.

This tests establishes a dchan and then sends MS POWER CONTROL messages
with differen power levels and then checks the presence of the power
level set in the MS POWER LEVEL field of the SACCH L1 header.

Change-Id: I82b04a3bf94d355175f7f6ff3fdc43672e8080a2
Related: OS#1622
2018-12-23 10:36:58 +00:00
Neels Hofmeyr 873ae201bd update expected results
Change-Id: I32c29e62ca317937db771f8fb1540bb1fe9da2ab
2018-09-06 14:13:34 +02:00
Stefan Sperling 4880be4385 add DTX fill frame BTS tests
Add tests TC_tch_sign_l2_fill_frame and TC_tch_sign_l2_fill_frame_dtxd.

TC_tch_sign_l2_fill_frame is already passing and verifies that fill
frames are sent if there is nothing else to transmit on a SDCCH4/SDCCH8,
TCH/H, or TCH/F signalling channel where DTX is disabled for downlink.

TC_tch_sign_l2_fill_frame_dtxd is currently failing. It verifies that
only specific fill frames are sent, as required by GSM 05.08 for TCHF
signalling channels with DTX enabled for downlink. At present, our
implementation generates no fill frames in this case, which is one
piece of the problem described in issue OS#1950.

Change-Id: Id4e0de6e78b62cd408f600a57a28617d91da64af
Related: OS#1950
2018-08-09 11:08:44 +00:00
Stefan Sperling cd9e86f618 update expected test result for TC_sacch_multi_chg
This test has been passing since osmo-bts commit
eee7247ebe0d0a54a54b53b739bdd434dfceb511, so expect
it to pass instead of fail.

Change-Id: I576f881fcb40c4fcbe6b6f767220111a0e9ffd3c
Related: OS#3173
2018-07-26 20:36:55 +00:00
Neels Hofmeyr 4fefb305ed expected results: pass BTS_Test.TC_rll_rel_req
Change-Id: Ic436e89c4333b49f39e1e9c387a5a9c79abdba15
2018-05-14 14:20:09 +02:00
Harald Welte 8e8cd67b81 update expected results
Change-Id: I65f72e9a8a9031a9715c7c2237824a45d7d8bef1
2018-05-10 23:11:54 +02:00
Neels Hofmeyr 29402a1efd add bts/expected-results.xml
Change-Id: I677b65cbfd5762ff016b188a0f18ce1e5710f45d
2018-05-09 12:50:17 +00:00