Commit Graph

4 Commits

Author SHA1 Message Date
Vadim Yanitskiy a8d37628a0 ttcn3-docker-prepare.sh: fix handling of multiple PROJECTs
Change-Id: Ib921d7c5cb2c628f3eca8d5c886375f3288e1dd6
2021-03-16 16:06:04 +01:00
Oliver Smith 914a486ef1 debian-stretch-titan: prepare: start/stop links
Create symlinks to ttcn3-*-start.sh and ttcn3-*-stop.sh in the
prepare.sh script instead of in each of the ttcn3 Dockerfiles.

Related: OS#5017
Change-Id: I634cf71cff7936efe6e0461d21dc1119de922ada
2021-02-11 15:45:40 +01:00
Oliver Smith 9206cf6b28 debian-stretch-titan: prepare: run 'make deps'
Run 'make deps' in ttcn3-docker-prepare.sh, if needed.

Related: OS#5017
Change-Id: I9085203b27d310b63a035fd71f7c2a78d02710d4
2021-02-11 15:45:40 +01:00
Oliver Smith 892d910444 ttcn3: move prepare code to shared script
Move the git fetch/checkout code and make call to build the testsuite,
to debian-stretch-titan/ttcn3-docker-prepare.sh. In the next patch, I
will extend the script to update deps right before building too (e.g.
because OSMO_TTCN3_BRANCH changed).

Related: OS#5017
Change-Id: I4b5bedf058dc527e821f9b7204c632820e671af9
2021-02-11 15:45:40 +01:00